{"title":"AECOM ACADEMY","description":"Built Intelligence is proud to support AECOM Academy which delivers training, professional development and internships to equip graduates with the technical skills and business acumen required to deliver complex infrastructure projects.","products":[{"product_id":"nec-contract-ecc-works-information-guidance","title":"NEC3 ECC Works Information Guidance","description":"\u003cp\u003e\u003cspan style=\"line-height: 1.2;\"\u003eThis comprehensive works information guidance document was produced by Thomas Telford Ltd, which is a wholly owned subsidiary of the Institution of Civil Engineers (ICE) the owner and developer of the NEC.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eNEC wishes to acknowledge and thank the NEC3 ECC Works¬†Information Guidance project team for their input to this guidance. Members of the project team include M Garratt, NG Bailey, Griffiths, Horizon Nuclear Power, P Higgins, PD Consult Ltd, T Knee-Robinson, Davis Langdon and Nigel Shaw.\u003c\/p\u003e\n\u003cmeta charset=\"utf-8\"\u003e\n\u003cp\u003e\u003cspan\u003eYou can download this guidance note as a PDF for free!\u003c\/span\u003e\u003c\/p\u003e","brand":"Thomas Telford Ltd","offers":[{"title":"Default Title","offer_id":342207035,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_7590274_dbb2952b-83ea-450a-9724-54102d3301b5.jpg?v=1541685226"},{"product_id":"nec-contract-ecc-schedule-of-partners-x12","title":"NEC3 ECC Schedule of Partners X12 Template","description":"\u003cp\u003eX12 under the NEC Contract requires a schedule of partners in order to operate this provision. This MS word template provides a good starting place for those compiling this for the first time.\u003c\/p\u003e\n\u003cmeta charset=\"utf-8\"\u003e\n\u003cp\u003e\u003cspan\u003eYou can download this template as a PDF for free!\u003c\/span\u003e\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":342209819,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_303643508_1d87f3fd-5bc4-4703-ab02-94b6e9b045ff.jpg?v=1541685225"},{"product_id":"nec-breakdown-of-people-costs-ecc-options-c-d-and-e","title":"NEC3 ECC Breakdown of People Costs Options C, D and E Checklist","description":"\u003cp\u003eIt would be wise to fully understand what costs must be included when pricing people costs for NEC tenders. This MS Excel checklist provides a good starting place those compiling this for the first time.\u003c\/p\u003e\n\u003cmeta charset=\"utf-8\"\u003e\n\u003cp\u003e\u003cspan\u003eYou can download this¬†checklist¬†as an excel¬†file¬†for free!\u003c\/span\u003e\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":342210369,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_4458160_b7f09c7e-c739-474e-8652-f44729fd7d50.jpg?v=1541685224"},{"product_id":"draft-contract-award-notice","title":"Contract Award Notice Template for Public Procurements","description":"An award letter is the decision notice sent out to all successful supplier(s) once the evaluation decision has been made. The despatch of a valid award letter, together with letters to unsuccessful suppliers, represents the start of the important standstill stage in the procurement process. As such, it is one which it is important to get right in order to manage the legal risk of a challenge and to avoid unnecessary delay to the award of the contract.\u003cbr\u003e\u003cbr\u003eThere are the following general points to bear in mind when drafting an award letter\/decision notice to be sent to the successful bidder(s):\u003cbr\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.5;\"\u003eMake sure that the letter does not imply that the contracting authority accepts the offer made by the supplier, as any such acceptance is likely to be binding, and this is not appropriate until the standstill period has expired\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.5;\"\u003eMake sure the notice does not amount to a representation by the contracting authority that it will definitely proceed to accept the supplier' offer provided that there is no legal challenge during the standstill period\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.5;\"\u003eGiven that the contracting authority is likely to be entering into contractual relations with the successful bidder, the aim is to draft the award notice in a positive way that gives encouragement and comfort to the successful bidder, while at the same time ensuring that the contracting authority does not commit itself to any binding legal obligations at this stage.\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThis letter can be adapted for use for procurements regulated by both the Public Contracts Regulations 2006 (PCR 2006) and the Public Contracts Regulations 2015 (PCR 2015). Procurements commenced before 26 February 2015 will be regulated by the PCR 2006. Procurements commenced on or after 26 February 2015 will be regulated by the PCR 2015.\u003c\/p\u003e\n\u003cp\u003eAccordingly, when using this document, you will need to delete references to the regulations which do not apply to your procurement. For these purposes, a procurement will be commenced when:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.5;\"\u003eA contract notice has been sent to the Official Journal in order to invite offers or requests to be selected to tender for or to negotiate in respect of the proposed contract or framework agreement; or\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.5;\"\u003eThe contracting authority has had published any form of advertisement seeking offers or expressions of interest in the proposed contract or framework agreement, or\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.5;\"\u003eThe contracting authority has contacted any supplier in order to (i) seek expressions of interest or offers in respect of the proposed contract or framework agreement; or (ii) respond to an unsolicited expression of interest or offer received from that supplier in relation to the proposed contract or framework agreement.\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eNote that this document is a template and will require tailoring to add the relevant detail. In particular, note that where there is more than one successful supplier (such as a framework agreement with multiple suppliers) the award letter must contain the relevant information for each successful supplier.\u003cbr\u003e\u003cbr\u003eThe award letters and letters to unsuccessful bidders should all be despatched at the same time.\u003c\/p\u003e\n\u003cmeta charset=\"utf-8\"\u003e\n\u003cp\u003e\u003cspan\u003eYou can download this template as a PDF for free!\u003c\/span\u003e\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29442222653501,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_432801814_59418807-9918-4a97-8652-7d4e1fd0b412.jpg?v=1542362216"},{"product_id":"party-structure-notice","title":"Party Wall Act PWA Guidance Note","description":"\u003cp\u003eThis guidance note¬†is not an authoritative interpretation of the law, but provides¬†general guidance in plain english. It aims to explain in simple terms how the Party Wall etc. Act 1996 (\"the Act\") may affect someone who either wishes to carry out work covered by the Act (the \"Building Owner\") or receives notification under the Act of proposed adjacent work (the \"Adjoining Owner\").\u003c\/p\u003e\n\u003cmeta charset=\"utf-8\"\u003e\n\u003cp\u003e\u003cspan\u003eYou can download this¬†guidance note as a PDF for free!\u003c\/span\u003e\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":28574516903997,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_334910669_fc42fb8c-b02c-47ef-881b-2e26d0e00241.jpg?v=1541685213"},{"product_id":"nec3-early-warning-register-free-template","title":"NEC3 ECC Early Warning or Risk Register Template","description":"\u003cp\u003eUse this free downloadable template to help you notify early warnings under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eEarly warning is a core process in NEC contracts requiring the project team to notify, manage and mitigate risks which could impact upon time, cost or quality.\u003c\/p\u003e\n\u003cp\u003eFollowing notification, the \u003cem\u003eProject Manager\u003c\/em\u003e and \u003cem\u003eContractor\u003c\/em\u003e (and any relevant others) are required to meet to discuss the notified early warnings at regular risk reduction meetings.\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECC template for \u003cem\u003eContractor’s\u003c\/em\u003e or \u003cem\u003eProject Manager\u003c\/em\u003e’s notifications of early warning under clause 16.1.\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":361416091,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_550920949_cf1695e3-388e-49ef-bd46-c5e8161de1dd.jpg?v=1541685212"},{"product_id":"prince2-templates-based-on-the-2009-edition-of-managing-successful-projects-with-prince2","title":"PRINCE2 Templates Pack 2009 Ed.","description":"\u003cp\u003eBased on the 2009 edition of Managing Successful Projects with PRINCE2, the PRINCE2 templates are available below as compressed zip files and can be downloaded in either .doc (MS Word) or .xls (MS Excel) format.\u003c\/p\u003e\n\u003cp\u003eYou may reproduce part or all of the PRINCE2 templates free of charge, provided your use is in accordance with the waiver terms which are detailed below:\u003c\/p\u003e\n\u003cp\u003eUse of the templates (the Material) indicates Your acceptance of the terms and conditions set out below.\u003c\/p\u003e\n\u003cp\u003eAXELOS (the Licensor) grants You a worldwide, royalty-free, perpetual, non-exclusive licence to use the Material subject to the conditions below.\u003c\/p\u003e\n\u003cp\u003eThis licence does not affect Your freedom under fair dealing or fair use or any other copyright exceptions and limitations.\u003c\/p\u003e\n\u003cmeta charset=\"utf-8\"\u003e\n\u003cp\u003e\u003cspan\u003eYou can download this template as a PDF for free!\u003c\/span\u003e\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":28574521655357,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_409916785_d7f4b34f-c7ee-4db4-9892-05edb7304370.jpg?v=1541685179"},{"product_id":"ebook-nec3-faqs-on-defined-cost-and-payment-from-nec-contract-users","title":"eBook NEC3 FAQs on Defined Cost and Payment from NEC Contract Users (Free Download)","description":"\u003cp\u003eIn 2005 when asked to provide a client new to NEC3 with an internal NEC helpdesk, my colleagues asked how long I might be doing the job. Their estimates varied from 12 months to 5 years... There aren't that many questions you can ask on the NEC Contract.\u003c\/p\u003e\n\u003cp\u003eTen years on you are reading a compilation of the NEC Contract questions and answers from the NEC3 project community and there is no sign that this shows any sign of running out of steam. The questions asked are sometimes funny but always real world and some are more tellings of the difficulties users run into when they haven't done their homework.\u003c\/p\u003e\n\u003cblockquote\u003e\n\u003cp\u003e\u003cstrong\u003eWho is responsible for an estimating error in the tendered total of the Prices?\u003c\/strong\u003e\u003c\/p\u003e\n\u003c\/blockquote\u003e\n\u003cp\u003eSo why have NEC3 forums on LinkedIn and ReachBack thrived against all expectations?\u003c\/p\u003e\n\u003cp\u003eEvery week our email system is inundated with new questions and almost as rapidly, their peers answer these questions. Some might also say that this is the easiest book written to date on NEC Contract. This book is a result of their collaborative effort:- Tell me and I'll forget; show me and I may remember; involve me and I'll understand Chinese Proverb.\u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"line-height: 1.2;\"\u003eIf you find this book useful, you can join us by logging in at \u003c\/span\u003e\u003ca href=\"http:\/\/www.reachback.builtintelligence.com\/\" target=\"_blank\" title=\"NEC3 Helpdesk for NEC Contract Users\" style=\"line-height: 1.2;\" rel=\"noopener noreferrer\"\u003eNEC ReachBack\u003c\/a\u003e\u003cspan style=\"line-height: 1.2;\"\u003e, an on-line repository for sharing NEC know-how.\u003c\/span\u003e\u003c\/p\u003e","brand":"Chris Corr and Others","offers":[{"title":"Default Title","offer_id":29461539946557,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_174565787_69097b4c-760a-4f0f-b9b8-b3fc277f22db.jpg?v=1541685178"},{"product_id":"apm-definitions","title":"APM Body of Knowledge, 5th edition Definitions Guide","description":"\u003cp\u003eThe APM Body of Knowledge is a well-established collection of project management knowledge, now in its sixth edition. Divided into sections and topics it provides introductions and common guides to those areas considered essential to the discipline of managing projects. This information directly assists all those interested in project management in their work, studies and learning. The 5th Edition has a total of 52 topics divided amongst seven sections. The APM Body of Knowledge 5th Edition - Definitions is a subsection of the full document providing high-level definitions for each topic area. This free download from APM provides a set of definitions to key terms used.\u003c\/p\u003e\n\u003cp\u003eThe complete APM Body of Knowledge 5th Edition provides more detailed definitions of each topic, suggested reading lists, a glossary, list of acronyms and an¬†index, as well as cross-referencing, section-coding and a word search facility (in the digital version).\u003cbr\u003eThe full APM Body of Knowledge 5th Edition is available in book format from APM Publishing (www.apmpublishing.com) or as an exclusive APM members' benefit of CD-ROM. APM members can also download the APM Body of Knowledge in PDF format from the members area of the APM website (www.apm.org.uk)\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29461538504765,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_442109317_32455784-255e-4cfa-9449-9eec48fde701.jpg?v=1541685177"},{"product_id":"nec-contract-lessons-learnt-report-cambridgeshire-guided-busway-free-download","title":"NEC Contract Lessons Learnt Report - Cambridgeshire Guided Busway free download","description":"\u003cmeta charset=\"utf-8\"\u003e\n\u003cp\u003e\u003cspan\u003eCambridgeshire County Council has recently published a report produced by EC Harris into lessons learnt from the Cambridgeshire Guided Busway, procured under the NEC Contract.\u003c\/span\u003e\u003c\/p\u003e\n\u003cmeta charset=\"utf-8\"\u003e\n\u003cp\u003eThe key areas that the report reviewed are summarised below:-\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cspan\u003ethe process by which the chosen form of contract was selected;\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003ethe appropriateness of the chosen form of contract in this instance;\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003ewhether appropriate mechanisms were set up between the client, contractor \u003c\/span\u003eand project manager to manage and oversee the contract;\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003ethe risk transfer by the Council and whether this was reasonable;\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003eidentify what other public sector organisations have used this form of contract¬†\u003c\/span\u003eand if they have experienced similar outcomes;\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003edid the form of contract used to create incentives for the contractor to increase \u003c\/span\u003espend and delay and if so, how could this have been addressed;\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003ewhat alternative form of contracts was available and what protection they¬†\u003c\/span\u003ewould have afforded the Council;\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003ewhether an alternative form of contract, available at the time would have been¬†\u003c\/span\u003emore appropriate;\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003ewhat the Council and other public sector organisations should consider when \u003c\/span\u003eundertaking procurement of similar major projects;\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003eare there any lessons to be learnt in procurement, that with the benefit of \u003c\/span\u003ehindsight could have alerted us to the difficulties we eventually faced;\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003ewhether there are any further modifications to the form of contract available or \u003c\/span\u003econtracting procedures that would be more effective in managing risk.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe report provides a number of recommendations for NEC3 users and construction professionals that can be applied to future NEC projects.\u003c\/p\u003e","brand":"Cambridgeshire County Council","offers":[{"title":"Default Title","offer_id":29461540044861,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_598823639_22baa2cc-ce9f-418f-bb61-020bd7ddc3eb.jpg?v=1541685176"},{"product_id":"bribery-act-2010","title":"Bribery Act 2010","description":"\u003cp\u003eYou or your organisation may be liable for failing to prevent a person from bribing on your behalf. To avoid a conviction an organisation will need to demonstrate that it has adequate procedures in place to prevent bribery. Penalties have increased under the Bribery Act, the maximum term of imprisonment is now ten years and there is no limit on the size of fines that may be imposed.\u003c\/p\u003e\n\u003cp\u003eWhat you will learn about:\u003c\/p\u003e\n\u003cp\u003e1. What's covered by the Act and what constitutes a bride \u003cbr\u003e 2. When could I or my organisation could be liable \u003cbr\u003e 3. What procedures I need in place \u003cbr\u003e 4. Are there any grey areas.\u003c\/p\u003e\n\u003cp\u003eRecommended for: UK citizens, UK residents, companies established under UK law and non-UK companies that can be held liable for a failure to prevent bribery if they do business in the UK.\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":13282093334589,"sku":"17865-A","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_546898078.jpg?v=1541613322"},{"product_id":"nec3-ecc-project-manager-s-notification-template-pdf-download","title":"NEC3 ECC Project Manager Notification Template","description":"\u003cp\u003eUse this free downloadable template to help you create a \u003cem\u003eProject Manager \u003c\/em\u003eNotification under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eThe ECC places great emphasis on effective communication between the parties and one of the ways it accomplishes this is by requiring one party to notify the other of certain events and circumstances. \u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECC template for a \u003cem\u003eProject Manager’s\u003c\/em\u003e Notification of the following: -\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 13.2 of an address to receive communications\u003c\/li\u003e\n\u003cli\u003eNotify under clause 13.5 of an agreement to extend the reply for a communication\u003c\/li\u003e\n\u003cli\u003eNotify under clause 14.2 of a delegation or a cancellation of a delegation\u003c\/li\u003e\n\u003cli\u003eNotify under clause 17.1 of an ambiguity or inconsistency\u003c\/li\u003e\n\u003cli\u003eNotify under clause 20.5 of a change to the price for the work, the Completion Dates or Key Dates (main Option F)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 25.2 of an assessment of the amount to be paid as the \u003cem\u003eContractor\u003c\/em\u003e failed to provide services\u003c\/li\u003e\n\u003cli\u003eNotify under clause 25.3 of the amount assessed due to a failure to meet a Key Date\u003c\/li\u003e\n\u003cli\u003eNotify under clause 26.3 of an agreement that subcontract documents should not be submitted\u003c\/li\u003e\n\u003cli\u003eNotify under clause 27.2 to provide access to the work being done and Plant and Materials being stored\u003c\/li\u003e\n\u003cli\u003eNotify under clause 53.3 of the preliminary assessment of the \u003cem\u003eContractor’s\u003c\/em\u003e share (main Option C)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 53.4 of the final assessment of the \u003cem\u003eContractor’s\u003c\/em\u003e share (main Option C)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 53.7 of the preliminary assessment of the \u003cem\u003eContractor’s\u003c\/em\u003e share (main Option D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 53.8 of the final assessment of the \u003cem\u003eContractor’s\u003c\/em\u003e share (main Option D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 70.2 of permission to remove Plant and Materials from the Working Areas\u003c\/li\u003e\n\u003cli\u003eNotify under clause 72.1 of permission to allow Equipment to be left in the works\u003c\/li\u003e\n\u003cli\u003eNotify under clause 86.1 of the cost of insurance provided by the Employer\u003c\/li\u003e\n\u003cli\u003eNotify under clause 90.1 of a wish to terminate\u003c\/li\u003e\n\u003cli\u003eNotify under clause 91.2 of a default\/of the \u003cem\u003eContractor\u003c\/em\u003e not have not put right a default\u003c\/li\u003e\n\u003cli\u003eNotify under clause 91.3 of a default\/of the \u003cem\u003eContractor\u003c\/em\u003e not have not put right a default\u003c\/li\u003e\n\u003cli\u003eNotify under clause 92.2 that Equipment is no longer required\u003c\/li\u003e\n\u003cli\u003eNotify under clause X7.3 of the amount of reduction of delay damages following take over of part of the works\u003c\/li\u003e\n\u003cli\u003eNotify under clause X18.5 of a matter for which the \u003cem\u003eContractor\u003c\/em\u003e is liable\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eFor simplicity, you can also use this template for a ‘decision’ under clause 20.5, an ‘assessment’ under clauses 25.2, 25.3, 53.3, 53.4, 53.7, 53.8, 86.1 and X7.3, and ‘permission’ under clauses 70.2 and 72.1).\u003c\/p\u003e\n\u003cul\u003e\u003c\/ul\u003e","brand":"Chris Corr","offers":[{"title":"Default Title","offer_id":28574332026941,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_96855055_cc7b6ce9-798b-4fc9-aab1-f678379d94c5.jpg?v=1559279197"},{"product_id":"nec3-ecc-contractor-notification","title":"NEC3 ECC Contractors Notification Template","description":"\u003cp\u003eUse this free downloadable template to help you create a \u003cem\u003eContractor \u003c\/em\u003eNotification under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eThe ECC places great emphasis on effective communication between the parties and one of the ways it accomplishes this is by requiring one party to notify the other of certain events and circumstances.\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECC template for a \u003cem\u003eContractor’s\u003c\/em\u003e Notification of the following:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 13.2 of an address to receive communications\u003c\/li\u003e\n\u003cli\u003eNotify under clause 17.1 of an ambiguity or inconsistency (period for reply is \u003cem\u003eperiod for reply\u003c\/em\u003e)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 18.1 of an illegal or impossible requirement (period for reply is \u003cem\u003eperiod for reply\u003c\/em\u003e)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 20.3 of advice on the practical implications of the design and subcontracting arrangements (main Options C, D, E and F)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 73.1 that an object of historical or other interest has been found (period for reply is \u003cem\u003eperiod for reply\u003c\/em\u003e)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 87.1 of an instruction to submit insurance certificates (period for reply is \u003cem\u003eperiod for reply\u003c\/em\u003e)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 90.1 of a wish to terminate\u003c\/li\u003e\n\u003cli\u003eNotify under clause Y1.5 of the details of the Project Bank Account\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eFor simplicity, you can use this template for ‘advice’ under clause 20.3 and ‘instruction’ under clause 87.1.\u003cbr\u003e\u003c\/p\u003e","brand":"Chris Corr","offers":[{"title":"Default Title","offer_id":28574736285757,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_39743137_7ce0e72e-37a2-44bc-8e3b-d99c635c3668.jpg?v=1559283803"},{"product_id":"nec3-ecc-supervisor-s-notification-or-instruction-template","title":"NEC3 ECC Supervisor’s Notification","description":"\u003cp\u003eUse this free downloadable template to help you create a \u003cem\u003eSupervisor \u003c\/em\u003eNotification under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eThe ECC places great emphasis on effective communication between the parties and one of the ways it accomplishes this is by requiring one party to notify the other of certain events and circumstances.\u003c\/p\u003e\n\u003cp\u003eSupervisor notifications are in connection with tests, inspections and Defects.\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECC pdf template for \u003cem\u003eSupervisor’s\u003c\/em\u003e notifications to do the following: -\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 13.2 of an address to receive communications\u003c\/li\u003e\n\u003cli\u003eNotify under clause 14.2 of a delegation or the cancellation of a delegation\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Chris Corr","offers":[{"title":"Default Title","offer_id":28574852677693,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_125752277.jpg?v=1559284987"},{"product_id":"nec3-ecs-contractor-notification-template","title":"NEC3 ECS Contractor Notification Template","description":"\u003cp\u003eUse this free downloadable template to help you create a \u003cem\u003eContractor \u003c\/em\u003eNotification under the NEC3 Engineering and Construction Subcontract (ECS).\u003c\/p\u003e\n\u003cp\u003eThe ECS places great emphasis on effective communication between the parties and one of the ways it accomplishes this is by requiring one party to notify the other of certain events and circumstances.\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECS template for a \u003cem\u003eContractor\u003c\/em\u003e Notification of the following: -\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 13.2 of an address to receive communications\u003c\/li\u003e\n\u003cli\u003eNotify under clause 13.5 of an agreement to extend the reply for a communication\u003c\/li\u003e\n\u003cli\u003eNotify under clause 14.2 of a delegation or a cancellation of a delegation\u003c\/li\u003e\n\u003cli\u003eNotify under clause 17.1 of an ambiguity or inconsistency\u003c\/li\u003e\n\u003cli\u003eNotify under clause 25.2 of an assessment of the amount to be paid as the \u003cem\u003eSubcontractor\u003c\/em\u003e failed to provide services\u003c\/li\u003e\n\u003cli\u003eNotify under clause 25.3 of the amount assessed due to a failure to meet a Key Date\u003c\/li\u003e\n\u003cli\u003eNotify under clause 26.3 of an agreement that subsubcontract documents should not be submitted\u003c\/li\u003e\n\u003cli\u003eNotify under clause 27.2 to provide access to the work being done and Plant and Materials being stored\u003c\/li\u003e\n\u003cli\u003eNotify under clause 53.3 of the preliminary assessment of the \u003cem\u003eSubcontractor’s\u003c\/em\u003e share (main Option C)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 53.4 of the final assessment of the \u003cem\u003eSubcontractor’s\u003c\/em\u003e share (main Option C)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 53.7 of the preliminary assessment of the \u003cem\u003eSubcontractor’s\u003c\/em\u003e share (main Option D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 53.8 of the final assessment of the \u003cem\u003eSubcontractor’s\u003c\/em\u003e share (main Option D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 70.2 of permission to remove Plant and Materials from the Working Area\u003c\/li\u003e\n\u003cli\u003eNotify under clause 72.1 of permission to allow Equipment to be left in the works\u003c\/li\u003e\n\u003cli\u003eNotify under clause 86.1 of an assessment of the cost of insurance provided by the Contractor\u003c\/li\u003e\n\u003cli\u003eNotify under clause 90.1 of a wish to terminate\u003c\/li\u003e\n\u003cli\u003eNotify under clause 90.1 of the issue of a termination certificate\u003c\/li\u003e\n\u003cli\u003eNotify under clause 91.2 of a default\/of the \u003cem\u003eSubcontractor\u003c\/em\u003e not have not put right a default\u003c\/li\u003e\n\u003cli\u003eNotify under clause 91.3 of a default\/of the \u003cem\u003eSubcontractor\u003c\/em\u003e not have not put right a default\u003c\/li\u003e\n\u003cli\u003eNotify under clause 92.2 that Equipment is no longer required\u003c\/li\u003e\n\u003cli\u003eNotify under clause X7.3 of the amount of reduction of delay damages following take over of part of the subcontract works\u003c\/li\u003e\n\u003cli\u003eNotify under clause X18.5 of a matter for which the \u003cem\u003eSubcontractor\u003c\/em\u003e is liable\u003c\/li\u003e\n\u003cli\u003eNotify under clause X20.5 of adding a KPI and payment to the Incentive Schedule\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eFor simplicity, you can also use this template for an ‘assessment’ under clauses 25.2, 25.3, 53.3, 53.4, 53.7, 53.8, 86.1 and X7.3, and ‘permission’ under clauses 70.2 and 72.1).\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":28575085887549,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_599815496_d6f49ad3-2d36-4bcb-a727-8fda281b21f4.jpg?v=1559288089"},{"product_id":"nec3-ecs-subcontractor-notification-template","title":"NEC3 ECS Subcontractor Notification Template","description":"\u003cp\u003eUse this free downloadable template to help you create a \u003cem\u003eSubcontractor \u003c\/em\u003eNotification under the NEC3 Engineering and Construction Subcontract (ECS).\u003c\/p\u003e\n\u003cp\u003eThe ECS places great emphasis on effective communication between the parties and one of the ways it accomplishes this is by requiring one party to notify the other of certain events and circumstances.\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECS template for a \u003cem\u003eSubcontractor’s\u003c\/em\u003e Notification of the following: \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 13.2 of an address for receiving communications\u003c\/li\u003e\n\u003cli\u003eNotify under clause 17.1 of an ambiguity or inconsistency\u003c\/li\u003e\n\u003cli\u003eNotify under clause 18.1 of an illegal or impossible requirement\u003c\/li\u003e\n\u003cli\u003eNotify under clause 20.3 of advice on the practical implications of the design and subsubcontracting arrangements (main Options C, D and E)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 73.1 that an object of historical or other interest has been found\u003c\/li\u003e\n\u003cli\u003eNotify under clause 87.1 of an instruction to submit insurance certificates (period for reply is \u003cem\u003eperiod for reply\u003c\/em\u003e) (use \u003cem\u003eContractor\u003c\/em\u003e Submission workflow)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 90.1 of wish to terminate\u003c\/li\u003e\n\u003cli\u003eNotify under clause Y1.5 of the Authorisation setting out sums due to the Subcontract Named Suppliers\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eFor simplicity, you can use this template for ‘advice’ under clause 20.3 and ‘instruction’ under clause 87.1.\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":28575218925629,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_98668634_baf48222-9a4c-4493-8307-25c32ca4649f.jpg?v=1559289667"},{"product_id":"nec3-ecs-contractor-s-instruction-ci-template","title":"NEC3 ECS Contractor Instruction (CI) Template","description":"\u003cp\u003eUse this free downloadable template to help you create a \u003cem\u003eContractor \u003c\/em\u003eInstruction under the NEC3 Engineering and Construction Subcontract (ECS).\u003c\/p\u003e\n\u003cp\u003eThe ECS gives the \u003cem\u003eContractor\u003c\/em\u003e wide ranging powers to issue instructions to the \u003cem\u003eSubcontractor\u003c\/em\u003e. Note, if an instruction will give rise to a compensation event, the \u003cem\u003eContractor\u003c\/em\u003e is obliged to notify the \u003cem\u003eSubcontractor\u003c\/em\u003e of the compensation event at the time of giving the instruction. That notification can be given by using form ‘NEC3 ECS \u003cem\u003eContractor\u003c\/em\u003e Notification’\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECS template for a \u003cem\u003eProject Manager’s \u003c\/em\u003eInstruction to do the following:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eInstruct under clause 14.3 to change the Subcontract Works Information or a Key Date\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 17.1 to resolve an ambiguity or inconsistency\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 18.1 to change the Subcontract Works Information to remove something which is illegal or impossible\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 19.1 on how to deal with a prevention event\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 23.1 to submit particulars of design of an item of Equipment (period for reply is \u003cem\u003eperiod for reply\u003c\/em\u003e)\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 24.2 to remove an employee\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 26.4 to submit proposed contract data for a subsubcontract (main Options C, D and E) (period for reply is \u003cem\u003eperiod for reply\u003c\/em\u003e)\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 34.1 to stop or not start work, or to start or restart work\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 36.1 to submit a quotation for acceleration (period for reply is \u003cem\u003eperiod for reply\u003c\/em\u003e)\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 60.6 correcting a mistake in the Bill of Quantities (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eInstruct under 73.1 on how to deal with an object of value or historical interest\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 82.1 to not replace or repair the subcontract works, Plant and Material following loss or damage\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 92.2 to leave Site, remove Equipment, Plant and Materials and assign the benefit of the subsubcontract to the \u003cem\u003eContractor\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003eInstruct under clause X12.1(4) providing Partnering Information\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29155055927357,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_599815493_a91aab60-e8aa-47a1-938c-d101aae1c3e4.jpg?v=1560868318"},{"product_id":"nec3-ecs-notification-of-early-warning-ewn-template","title":"NEC3 ECS Notification of Early Warning (EWN) Template","description":"\u003cp\u003eUse this free downloadable template to help you notify early warnings under the NEC3 Engineering and Construction Subcontract (ECS).\u003c\/p\u003e\n\u003cp\u003eEarly warning is a core process in NEC contracts requiring the project team to notify, manage and mitigate risks which could impact upon time, cost or quality.\u003c\/p\u003e\n\u003cp\u003eFollowing notification, the \u003cem\u003eContractor\u003c\/em\u003e and \u003cem\u003eSubcontractor\u003c\/em\u003e (and any relevant others) are required to meet to discuss the notified early warnings at regular risk reduction meetings.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECS template for \u003cem\u003eSubcontractor’s\u003c\/em\u003e or \u003cem\u003eContractor\u003c\/em\u003e’s notifications of early warning under clause 16.1.\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29155068641341,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_599815850_5727df66-2da0-4b75-99d5-1fac8bd62255.jpg?v=1560869062"},{"product_id":"nec3-ecs-subcontractors-issue-for-acceptance-sia","title":"NEC3 ECS Subcontractor's Issue for Acceptance (SIA) Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a \u003cem\u003eSubcontractor \u003c\/em\u003eissue for acceptance under the NEC3 Engineer and Construction Subcontract (ECS).\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECS template for a \u003cem\u003eSubcontractor \u003c\/em\u003eIssue of Acceptance to do the following: -\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eIssue for acceptance under clause 21.2 design in accordance with Works Information,\u003c\/li\u003e\n\u003cli\u003eIssue for acceptance under clause 23.1 design of an item of Equipment in accordance with Works Information,\u003c\/li\u003e\n\u003cli\u003eIssue for acceptance under clause 24.1 changes in key person who are equally qualified and experienced as the person originally named in the Contract Data,\u003c\/li\u003e\n\u003cli\u003eIssue for acceptance under clause 26.2 Sub-subcontractors,\u003c\/li\u003e\n\u003cli\u003eIssue for acceptance under clause 26.3 Sub-subcontract conditions,\u003c\/li\u003e\n\u003cli\u003eIssue for acceptance under clause 31.1 first programme for acceptance,\u003c\/li\u003e\n\u003cli\u003eIssue for acceptance under clause 32.1 revised programme for acceptance,\u003c\/li\u003e\n\u003cli\u003eIssue for acceptance under clause 36.2 a quotation for acceleration,\u003c\/li\u003e\n\u003cli\u003eIssue for acceptance under clause 85.1 Subcontractor insurances,\u003c\/li\u003e\n\u003cli\u003eIssue for acceptance under clause 54.2 a revised activity schedule,\u003c\/li\u003e\n\u003cli\u003eIssue for acceptance under clause 26.4 proposed sub-subcontract data, and\u003c\/li\u003e\n\u003cli\u003eIssue for acceptance under clause X13.1 a performance bond.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29155087155261,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_599815859_061617d3-0c35-47e4-88dc-c77e28131dc1.jpg?v=1560869589"},{"product_id":"nec3-ecs-contractor-s-acceptance-template","title":"NEC3 ECS Contractor Acceptance Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a \u003cem\u003eContractor \u003c\/em\u003eAcceptance under the NEC3 Engineer and Construction Subcontract (ECS).\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECS pdf template for \u003cem\u003eContractor \u003c\/em\u003eAcceptance (or non-acceptance) of the following: -\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eAcceptance under clause 21.2 of the \u003cem\u003eSubcontractor\u003c\/em\u003e design,\u003c\/li\u003e\n\u003cli\u003eAcceptance under clause 23.1 of the design of an item of Equipment,\u003c\/li\u003e\n\u003cli\u003eAcceptance under clause 24.1 of a change in Key People,\u003c\/li\u003e\n\u003cli\u003eAcceptance under clause 26.2 of Sub-contractors,\u003c\/li\u003e\n\u003cli\u003eAcceptance under clause 26.3 of Sub-contractor contract conditions,\u003c\/li\u003e\n\u003cli\u003eAcceptance under clause 31.3 of Subcontractor programme,\u003c\/li\u003e\n\u003cli\u003eAcceptance under clause 36.3\/4 of Subcontractor quotation for acceleration,\u003c\/li\u003e\n\u003cli\u003eAcceptance under clause 85.1 of the Subcontractor insurances,\u003c\/li\u003e\n\u003cli\u003eAcceptance under clause 54.3 pf the Subcontractor‚ revised activity schedule (under options A\/C),\u003c\/li\u003e\n\u003cli\u003eAcceptance under clause 26.4 of the Subcontractor‚ proposed subcontractor contract data, and\u003c\/li\u003e\n\u003cli\u003eAcceptance under clause X13.1 of a performance bond.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29155139485757,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_333095306_77983dcc-e6bc-4f98-b50b-8fb134cf2093.jpg?v=1560870190"},{"product_id":"nec3-ecs-notification-of-compensation-event-nce-template","title":"NEC3 ECS Notification of Compensation Event (NCE) Template","description":"\u003cp\u003eUse this free downloadable template to help you notify a compensation event under the NEC3 Engineer and Construction Subcontract (ECS).\u003c\/p\u003e\n\u003cp\u003eCompensation events are events, which if they occur and do not arise from the \u003cem\u003eSubcontractor\u003c\/em\u003e fault, entitle the\u003cem\u003e Subcontractor\u003c\/em\u003e to be compensated for any effect the event may have on Prices, the Completion Date and any Key Dates.\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECS template to notify the following types of compensation events: -\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 60.1(1): Contractor has given an instruction to change the Works Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(2): Access not provided by date shown on the programme\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(3): Contractor not provided something by date shown on programme\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(4): Contractor has given instruction to stop or not start work or change a Key Date\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(5): Employer, Contractor or Others don't work within times shown on programme or conditions within WI\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(6): no response to a communication within the contractual timescales\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(7): an item of historical interest or value found within site\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(8): a change to a decision previously communicated\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(9): acceptance withheld for a reason outside of the contract\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(10): searched for a Defect and none was found\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(11): test or inspection by Contractor or Supervisor causes unnecessary delay\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(12): unexpected physical conditions\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(13): weather measurement exceeding a 1 in 10-year event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(14): Contractor risk event has occurred\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(15): take over prior to Completion\/Completion Date\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(16): lack of provision of materials\/facilities\/samples for tests\/inspections\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(17): Contractor corrects an assumption related to a previous compensation event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(18): breach of subcontract by Contractor\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(19): Prevention event\u003c\/li\u003e\n\u003cli\u003eNotify under clause X2.1: Change in law\u003c\/li\u003e\n\u003cli\u003eNotify under clause X15.2: Correcting a Defect that was not the Subcontractor liability\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eYou can download this template for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29155156590653,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_599815496_d3193e91-7ae2-4a3d-82de-12d7af6e7237.jpg?v=1560871041"},{"product_id":"nec3-ecs-contractor-response-to-notification-of-compensation-event-crn-template","title":"NEC3 ECS Contractor Response to Notification of Compensation Event (CRN) Template","description":"\u003cp\u003eUse this free downloadable template to help you create a compensation event notification under the NEC3 Engineering and Construction Subcontract (ECS).\u003c\/p\u003e\n\u003cp\u003eCompensation events are events listed in the contract which, if they occur and do not arise from the \u003cem\u003eSubcontractor’s\u003c\/em\u003e fault, entitle the\u003cem\u003e Subcontractor\u003c\/em\u003e to be compensated for any effect the event may have on Prices, the Completion Date and any Key Dates.\u003c\/p\u003e\n\u003cp\u003eThe ECS contains strict notification and procedural requirements which take a compensation event from notification to implementation.\u003c\/p\u003e\n\u003cp\u003eYou can use these NEC3 ECS templates for notifying the following compensation events:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 60.1(1) of an instruction to change the Subcontract Works Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(2) that the \u003cem\u003eContractor\u003c\/em\u003e has not provided access to the Site\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(3) that the \u003cem\u003eContractor \u003c\/em\u003ehas not provided something that he has to provide\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(4) of an instruction to stop or not start work or to change a Key Date\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(5) that the \u003cem\u003eEmployer, Contractor\u003c\/em\u003e or Others do not work within the stated constraints\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(6) that the \u003cem\u003eContractor\u003c\/em\u003e does not reply to a communication\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(7) of an instruction dealing with an object of interest or value\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(8) that the \u003cem\u003eContractor\u003c\/em\u003e has changed a decision\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(9) that the \u003cem\u003eContractor\u003c\/em\u003e withholds an acceptance\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(10) an instruction to search for a Defect and no Defect is found\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(11) that a test or inspection causes unnecessary delay\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(12) that the \u003cem\u003eSubcontractor\u003c\/em\u003e encounters unexpected physical conditions\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(13) that an extreme weather measurement is recorded\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(14) an event occurs which is the \u003cem\u003eEmployer’s\u003c\/em\u003e or \u003cem\u003eContractor’s\u003c\/em\u003e risk\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(15) that the \u003cem\u003eContractor \u003c\/em\u003ecertifies Take Over before Completion\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(16) that the \u003cem\u003eContractor \u003c\/em\u003edoes not provide materials for testing\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(17) that the \u003cem\u003eContractor\u003c\/em\u003e notifies a correction to an assumption\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(18) of a breach by the \u003cem\u003eContractor\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(19) of a prevention event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.4 of a difference between the final total quantity of an item and the quantity in the Bill of Quantities which delays completion (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.5 of a difference between the final total quantity of an item and the quantity in the Bill of Quantities (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.6 of a correction of a mistake in the Bill of Quantities caused by a departure from the method of measurement (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause X2.1 of a change in the law\u003c\/li\u003e\n\u003cli\u003eNotify under clause X12.3(7) of a change in the Partnering Timetable\u003c\/li\u003e\n\u003cli\u003eNotify under clause X12.3(8) of a change in the Partnering Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause X14.2 of a delay in making advanced payment\u003c\/li\u003e\n\u003cli\u003eNotify under clause X15.2 of correcting a Defect for which the \u003cem\u003eSubcontractor\u003c\/em\u003e is not liable\u003c\/li\u003e\n\u003cli\u003eNotify under clause Y2.4 of suspension of performance\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eYou can also use these templates to: \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eInstruct the \u003cem\u003eSubcontractor\u003c\/em\u003e under clause 61.1 and 61.4 to submit a quotation for a compensation event\u003c\/li\u003e\n\u003cli\u003eInstruct the \u003cem\u003eSubcontractor\u003c\/em\u003e under clause 61.2 to submit quotations for proposed instructions\u003c\/li\u003e\n\u003cli\u003eReply under clause 61.4 to the \u003cem\u003eSubcontractor’s\u003c\/em\u003e notification of a compensation event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.4 and 62.5 of an agreement to extend the period for a submission or reply\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.4, 62.6 and 64.4 of a failure of the \u003cem\u003eContractor\u003c\/em\u003e to respond or make an assessment\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.5 that the \u003cem\u003eContractor\u003c\/em\u003e has decided that the \u003cem\u003eSubcontractor\u003c\/em\u003e did not give early warning\u003c\/li\u003e\n\u003cli\u003eState assumptions under clause 61.6 about the event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.6 that an assumption on which a compensation event is based was wrong\u003c\/li\u003e\n\u003cli\u003eInstruct the \u003cem\u003eSubcontractor\u003c\/em\u003e under clause 62.1 to submit alternative quotations for a compensation event\u003c\/li\u003e\n\u003cli\u003eSubmit a quotation for a compensation event under clause 62.3\u003c\/li\u003e\n\u003cli\u003eReply to a quotation under clause 62.3\u003c\/li\u003e\n\u003cli\u003eNotify under clause 64 of the \u003cem\u003eContractor’s\u003c\/em\u003e assessment of a compensation event\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29155164389437,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_458718325_7ea2b8d6-cc22-42bd-99cc-b6b8e086b289.jpg?v=1560871424"},{"product_id":"nec3-ecs-subcontractor-s-quotation-for-compensation-event-ceq-template","title":"NEC3 ECS Subcontractor Quotation for Compensation Event (CEQ) Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a \u003cem\u003eSubcontractor \u003c\/em\u003equotation for a compensation event under the NEC3 Engineer and Construction Subcontract (ECS).\u003c\/p\u003e\n\u003cp\u003eAfter giving the instruction and notifying the compensation event, the \u003cem\u003eContractor\u003c\/em\u003e is required to instruct the \u003cem\u003eSubcontractor \u003c\/em\u003eto submit quotations, unless the event arises from a fault of the \u003cem\u003eSubcontractor\u003c\/em\u003e or quotations have already been submitted. This is stated in clause 61.1.\u003c\/p\u003e\n\u003cp\u003eThe quotation as a minimum must set out the cost effect on total of the Prices and the time effect on the Completion Date, Key Date(s) and Sectional Completion Date(s)\u003c\/p\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29155171696701,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_599815496_3a3619d2-aa5e-43e3-8e03-8c9394993cfb.jpg?v=1560871760"},{"product_id":"nec3-ecs-contractor-s-response-assessment-of-ce-quotation-ca","title":"NEC3 ECS Contractor Response\/Assessment of CE Quotation (CA) Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a \u003cem\u003eContractor\u003c\/em\u003e response of a compensation event quotation under the NEC3 Engineer and Construction Subcontract (ECS).\u003c\/p\u003e\n\u003cp\u003eUpon receipt of the quotation the \u003cem\u003eContractor\u003c\/em\u003e, in accordance with clause 62.3, can instruct the \u003cem\u003eSubcontractor\u003c\/em\u003e to submit a revised quotation (only after explaining their reasons for doing so), accept this or notify that they will be making their own assessment which may happen in certain circumstances such as the \u003cem\u003eSubcontractor\u003c\/em\u003e not submitting a quotation and details of his assessment within the time allowed.\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29155179593789,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_466577669_2bc4a525-d7cc-4e31-b8ae-42d8b44450ec.jpg?v=1560872199"},{"product_id":"nec3-ecs-contractor-s-implementation-of-compensation-event-template","title":"NEC3 ECS Contractor Implementation of Compensation Event Template","description":"\u003cp\u003eUse this free downloadable template to help you create a compensation event notification under the NEC3 Engineering and Construction Subcontract (ECS).\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eCompensation events are events listed in the contract which, if they occur and do not arise from the \u003cem\u003eSubcontractor’s\u003c\/em\u003e fault, entitle the\u003cem\u003e Subcontractor\u003c\/em\u003e to be compensated for any effect the event may have on Prices, the Completion Date and any Key Dates.\u003c\/p\u003e\n\u003cp\u003eThe ECS contains strict notification and procedural requirements which take a compensation event from notification to implementation.\u003c\/p\u003e\n\u003cp\u003eYou can use these NEC3 ECS templates for notifying the following compensation events:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 60.1(1) of an instruction to change the Subcontract Works Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(2) that the \u003cem\u003eContractor\u003c\/em\u003e has not provided access to the Site\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(3) that the \u003cem\u003eContractor \u003c\/em\u003ehas not provided something that he has to provide\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(4) of an instruction to stop or not start work or to change a Key Date\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(5) that the \u003cem\u003eEmployer, Contractor\u003c\/em\u003e or Others do not work within the stated constraints\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(6) that the \u003cem\u003eContractor\u003c\/em\u003e does not reply to a communication\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(7) of an instruction dealing with an object of interest or value\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(8) that the \u003cem\u003eContractor\u003c\/em\u003e has changed a decision\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(9) that the \u003cem\u003eContractor\u003c\/em\u003e withholds an acceptance\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(10) an instruction to search for a Defect and no Defect is found\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(11) that a test or inspection causes unnecessary delay\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(12) that the \u003cem\u003eSubcontractor\u003c\/em\u003e encounters unexpected physical conditions\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(13) that an extreme weather measurement is recorded\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(14) an event occurs which is the \u003cem\u003eEmployer’s\u003c\/em\u003e or \u003cem\u003eContractor’s\u003c\/em\u003e risk\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(15) that the \u003cem\u003eContractor \u003c\/em\u003ecertifies Take Over before Completion\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(16) that the \u003cem\u003eContractor \u003c\/em\u003edoes not provide materials for testing\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(17) that the \u003cem\u003eContractor\u003c\/em\u003e notifies a correction to an assumption\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(18) of a breach by the \u003cem\u003eContractor\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(19) of a prevention event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.4 of a difference between the final total quantity of an item and the quantity in the Bill of Quantities which delays completion (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.5 of a difference between the final total quantity of an item and the quantity in the Bill of Quantities (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.6 of a correction of a mistake in the Bill of Quantities caused by a departure from the method of measurement (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause X2.1 of a change in the law\u003c\/li\u003e\n\u003cli\u003eNotify under clause X12.3(7) of a change in the Partnering Timetable\u003c\/li\u003e\n\u003cli\u003eNotify under clause X12.3(8) of a change in the Partnering Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause X14.2 of a delay in making advanced payment\u003c\/li\u003e\n\u003cli\u003eNotify under clause X15.2 of correcting a Defect for which the \u003cem\u003eSubcontractor\u003c\/em\u003e is not liable\u003c\/li\u003e\n\u003cli\u003eNotify under clause Y2.4 of suspension of performance\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eYou can also use these templates to:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eInstruct the \u003cem\u003eSubcontractor\u003c\/em\u003e under clause 61.1 and 61.4 to submit a quotation for a compensation event\u003c\/li\u003e\n\u003cli\u003eInstruct the \u003cem\u003eSubcontractor\u003c\/em\u003e under clause 61.2 to submit quotations for proposed instructions\u003c\/li\u003e\n\u003cli\u003eReply under clause 61.4 to the \u003cem\u003eSubcontractor’s\u003c\/em\u003e notification of a compensation event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.4 and 62.5 of an agreement to extend the period for a submission or reply\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.4, 62.6 and 64.4 of a failure of the \u003cem\u003eContractor\u003c\/em\u003e to respond or make an assessment\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.5 that the \u003cem\u003eContractor\u003c\/em\u003e has decided that the \u003cem\u003eSubcontractor\u003c\/em\u003e did not give early warning\u003c\/li\u003e\n\u003cli\u003eState assumptions under clause 61.6 about the event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.6 that an assumption on which a compensation event is based was wrong\u003c\/li\u003e\n\u003cli\u003eInstruct the \u003cem\u003eSubcontractor\u003c\/em\u003e under clause 62.1 to submit alternative quotations for a compensation event\u003c\/li\u003e\n\u003cli\u003eSubmit a quotation for a compensation event under clause 62.3\u003c\/li\u003e\n\u003cli\u003eReply to a quotation under clause 62.3\u003c\/li\u003e\n\u003cli\u003eNotify under clause 64 of the \u003cem\u003eContractor’s\u003c\/em\u003e assessment of a compensation event\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29155197943869,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_599815193_b142706b-3f0c-4bd9-9ff0-f584472359e9.jpg?v=1560873253"},{"product_id":"webinar-how-to-produce-and-update-your-programme-under-nec3-ecs","title":"Webinar - How to Produce and Update your Programme Under NEC3 ECS","description":"\u003ch4\u003eTHU, OCT 15, 2026, 13:00 PM BST\u003c\/h4\u003e\n\u003ch4\u003ePresented by Neil Earnshaw and Chris Corr\u003c\/h4\u003e\n\u003cp\u003eThis one-hour webinar provides a quick and easy walk you through programming obligations work under NEC3 ECS and provide an overview of the main provisions of under section 3 of the ECS Contract: producing a programme, updating the programme, programme acceptance and how float is incorporated into the programme. \u003cbr\u003e\u003c\/p\u003e","brand":"Chris Corr and Neil Earnshaw","offers":[{"title":"Default Title","offer_id":40756466155581,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/files\/Neil_Earnshaw_Webinars_828aab85-6068-4336-b3c3-76859f0fc727.png?v=1786607137"},{"product_id":"nec3-ecc-delegation-of-pm-duties-template","title":"NEC3 ECC Delegation of PM Duties Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a [\u003ci\u003eProject Manager \u003c\/i\u003eDuties\u003ci\u003e \u003c\/i\u003eform under the NEC3 Engineer and Construction Contract (ECC). You can also use this NEC3 ECC pdf template to draft a number of other contract notices. \u003c\/p\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29446913261629,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_c520978a-c582-4c00-b903-557ab9601f1a.jpg?v=1563963830"},{"product_id":"nec3-ecc-delegation-of-supervisors-duties-template","title":"NEC3 ECC Delegation of Supervisors Duties Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a [Delegation of Supervisors Duties form under the NEC3 Engineer and Construction Contract (ECC). You can also use this NEC3 ECC pdf template to draft a number of other contract notices. \u003c\/p\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29446918766653,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_388ebfce-51a5-495e-bce7-0ab0c2e5cdb4.jpg?v=1563964449"},{"product_id":"nec3-ecc-cancellation-of-pm-delegated-duties-template","title":"NEC3 ECC Cancellation of PM Delegated Duties Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a cancellation of PM delegated duties form under the NEC3 Engineer and Construction Contract (ECC). You can also use this NEC3 ECC pdf template to draft a number of other contract notices.\u003c\/p\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29446921584701,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_8d602072-7fbb-4d83-8eaa-dce324d8b705.jpg?v=1563964865"},{"product_id":"nec3-ecc-cancellation-of-pm-delegated-duties-template-1","title":"NEC3 ECC Cancellation of PM Delegated Duties Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a cancellation of PM delegated duties under the NEC3 Engineer and Construction Contract (ECC). You can also use this NEC3 ECC pdf template to draft a number of other contract notices.\u003c\/p\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29446929317949,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_a8ca2b3e-fa97-4436-b490-310b93c88204.jpg?v=1563965830"},{"product_id":"nec3-ecc-project-managers-instruction-pmi-template","title":"NEC3 ECC Project Managers instruction (PMI) Template","description":"\u003cp\u003eUse this free downloadable template to help you create a \u003cem\u003eProject Manager\/Employer \u003c\/em\u003eInstruction under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eThe ECC gives the \u003cem\u003eProject Manager\u003c\/em\u003e wide ranging powers to issue instructions to the \u003cem\u003eContractor\u003c\/em\u003e. Note, if an instruction will give rise to a compensation event, the \u003cem\u003eProject Manager\u003c\/em\u003e is obliged to notify the \u003cem\u003eContractor\u003c\/em\u003e of the compensation event at the time of giving the instruction. That notification can be given by using form ‘NEC3 ECC \u003cem\u003eProject Manager\u003c\/em\u003e Notification’\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECC template for a \u003cem\u003eProject Manager’s\/Employer’s \u003c\/em\u003eInstruction to do the following: \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eInstruct under clause 14.3 to change the Works Information or a Key Date\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 17.1 to resolve an ambiguity or inconsistency\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 18.1 to change the Works Information to remove something which is illegal or impossible\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 19.1 on how to deal with a prevention event\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 23.1 to submit particulars of design of an item of Equipment (period for reply is \u003cem\u003eperiod for reply\u003c\/em\u003e)\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 24.2 to remove an employee\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 26.4 to submit proposed contract data for a subcontract (main Options C, D, E and F) (period for reply is \u003cem\u003eperiod for reply\u003c\/em\u003e)\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 34.1 to stop or not start work, or to start or restart work\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 36.1 to submit a quotation for acceleration (period for reply is \u003cem\u003eperiod for reply\u003c\/em\u003e)\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 60.6 correcting a mistake in the Bill of Quantities (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 73.1 on how to deal with an object of value or historical interest\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 82.1 to not replace or repair the works, Plant and Material following loss or damage\u003c\/li\u003e\n\u003cli\u003eInstruct under clause X12.1(4) providing Partnering Information\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29446935871549,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_894a7443-93ad-4517-aca9-f9340d982695.jpg?v=1563966832"},{"product_id":"nec3-ecc-early-warning-notification-by-pm-template","title":"NEC3 ECC Early Warning Notification by Project Manager Template","description":"\u003cp\u003eUse this free downloadable template to help you notify early warnings under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eEarly warning is a core process in NEC contracts requiring the project team to notify, manage and mitigate risks which could impact upon time, cost or quality.\u003c\/p\u003e\n\u003cp\u003eFollowing notification, the \u003cem\u003eProject Manager\u003c\/em\u003e and \u003cem\u003eContractor\u003c\/em\u003e (and any relevant others) are required to meet to discuss the notified early warnings at regular risk reduction meetings. \u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECC template for \u003cem\u003eContractor’s\u003c\/em\u003e or \u003cem\u003eProject Manager\u003c\/em\u003e’s notifications of early warning under clause 16.1.\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29446937018429,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_94f52306-3608-4d9d-a203-6c012820c689.jpg?v=1563967119"},{"product_id":"nec3-ecc-early-warning-notification-by-the-contractor-template","title":"NEC3 ECC Early Warning Notification by the Contractor Template","description":"\u003cp\u003eUse this free downloadable template to help you notify early warnings under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eEarly warning is a core process in NEC contracts requiring the project team to notify, manage and mitigate risks which could impact upon time, cost or quality.\u003c\/p\u003e\n\u003cp\u003eFollowing notification, the \u003cem\u003eProject Manager\u003c\/em\u003e and \u003cem\u003eContractor\u003c\/em\u003e (and any relevant others) are required to meet to discuss the notified early warnings at regular risk reduction meetings.\u003c\/p\u003e\n\u003cp\u003e You can use this NEC3 ECC template for \u003cem\u003eContractor’s\u003c\/em\u003e or \u003cem\u003eProject Manager\u003c\/em\u003e’s notifications of early warning under clause 16.1.\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29446944063549,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_5b0cab20-0c68-410b-b4a7-d4ea8e2ff170.jpg?v=1563967392"},{"product_id":"nec3-ecc-completion-certificate-template","title":"NEC3 ECC Completion Certificate Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a Completion Certificate under the NEC3 Engineer and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29446946095165,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_80d2cbf5-6fdf-4f76-a903-d7dd8fb6c30f.jpg?v=1563967873"},{"product_id":"nec3-ecc-sectional-completion-certificate-option-x5-only-template","title":"NEC3 ECC Sectional Completion Certificate (Option X5 only) Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a Sectional Completion Certificate under the NEC3 Engineer and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447039942717,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_d3c5f406-e6f9-40a9-a99a-ff4cafabee25.jpg?v=1563974074"},{"product_id":"nec3-ecc-take-over-certificate-template","title":"NEC3 ECC Take Over Certificate Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a Take Over Certificate under the NEC3 Engineer and Construction Contract (ECC). \u003c\/p\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447042662461,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_de268234-b04f-4ad5-8595-4979801ec0a3.jpg?v=1563974335"},{"product_id":"nec3-ecc-take-over-certificate-for-a-section-of-the-works-template","title":"NEC3 ECC Take Over Certificate for a Section of the Works Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a Take over certificate for a section of the Works under the NEC3 Engineer and Construction Contract (ECC). \u003c\/p\u003e\n\u003cp\u003e You can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447045873725,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_2da65822-af92-42ee-b75a-297d86348557.jpg?v=1563974594"},{"product_id":"nec3-ecc-access-certificate-template","title":"NEC3 ECC Access Certificate Template","description":"\u003cp\u003eUse this free downloadable template to help you put together an Access Certificate under the [NEC3 Engineer and Construction Contract (ECC)\u003c\/p\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447046955069,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_969c1d27-09c7-44b0-a30f-240a52e31197.jpg?v=1563974790"},{"product_id":"nec3-ecc-defects-notification-by-the-supervisor-template","title":"NEC3 ECC Defects Notification by the Supervisor Template","description":"\u003cp\u003eUse this free downloadable template to help you create notifications in connection with Defects management under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eThe ECC gives the \u003cem\u003eSupervisor\u003c\/em\u003e wide ranging powers to address matters of Defects, including requiring tests and inspections and issuing the Defects Certificate. \u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECC template for communications in respect of Defects as follows: - \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 40.3 of a test or inspection\u003c\/li\u003e\n\u003cli\u003eNotify under clause 40.3 of the result of a test or inspection\u003c\/li\u003e\n\u003cli\u003eNotify under clause 40.6 of the cost incurred by the \u003cem\u003eEmployer\u003c\/em\u003e in repeating a test or inspection\u003c\/li\u003e\n\u003cli\u003eNotify under clause 41.1 that Plant and Materials have passed a test or inspection\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 42.1 to search for a Defect\u003c\/li\u003e\n\u003cli\u003eNotify under clause 42.2 of a Defect\u003c\/li\u003e\n\u003cli\u003eNotify under clause 43.3 of the issue of the Defect Certificate\u003c\/li\u003e\n\u003cli\u003eSubmit\/notify under clause 44.1 a proposal to accept a Defect\u003c\/li\u003e\n\u003cli\u003eSubmit under clause 44.2 for acceptance a quotation to accept a Defect\u003c\/li\u003e\n\u003cli\u003eReply under clause 44.2 to a quotation to accept a Defect\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 44.2 to change the Works Information after accepting a proposal not to correct a Defect\u003c\/li\u003e\n\u003cli\u003eNotify under clause 45.1 of the cost to the Employer of having a Defect corrected\u003c\/li\u003e\n\u003cli\u003eNotify under clause 45.2 of the cost the \u003cem\u003eContractor\u003c\/em\u003e would incur in correcting a Defect\u003cbr\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447051051069,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_5f7b53f4-29d7-422f-a87d-ba7c0140e44b.jpg?v=1563975087"},{"product_id":"nec3-ecc-defects-certificate-template","title":"NEC3 ECC Defects Certificate Template","description":"\u003cp\u003eUse this free downloadable template to help you create notifications in connection with Defects management under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eThe ECC gives the \u003cem\u003eSupervisor\u003c\/em\u003e wide ranging powers to address matters of Defects, including requiring tests and inspections and issuing the Defects Certificate.\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECC template for communications in respect of Defects as follows: - \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 40.3 of a test or inspection\u003c\/li\u003e\n\u003cli\u003eNotify under clause 40.3 of the result of a test or inspection\u003c\/li\u003e\n\u003cli\u003eNotify under clause 40.6 of the cost incurred by the \u003cem\u003eEmployer\u003c\/em\u003e in repeating a test or inspection\u003c\/li\u003e\n\u003cli\u003eNotify under clause 41.1 that Plant and Materials have passed a test or inspection\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 42.1 to search for a Defect\u003c\/li\u003e\n\u003cli\u003eNotify under clause 42.2 of a Defect\u003c\/li\u003e\n\u003cli\u003eNotify under clause 43.3 of the issue of the Defect Certificate\u003c\/li\u003e\n\u003cli\u003eSubmit\/notify under clause 44.1 a proposal to accept a Defect\u003c\/li\u003e\n\u003cli\u003eSubmit under clause 44.2 for acceptance a quotation to accept a Defect\u003c\/li\u003e\n\u003cli\u003eReply under clause 44.2 to a quotation to accept a Defect\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 44.2 to change the Works Information after accepting a proposal not to correct a Defect\u003c\/li\u003e\n\u003cli\u003eNotify under clause 45.1 of the cost to the Employer of having a Defect corrected\u003c\/li\u003e\n\u003cli\u003eNotify under clause 45.2 of the cost the \u003cem\u003eContractor\u003c\/em\u003e would incur in correcting a Defect\u003cbr\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447052001341,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_cb13a982-39be-4329-9845-ea617e645342.jpg?v=1563975291"},{"product_id":"nec3-ecc-defects-notification-by-the-contractor-template","title":"NEC3 ECC Defects Notification by the Contractor Template","description":"\u003cp\u003eUse this free downloadable template to help you create notifications in connection with Defects management under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eThe ECC gives the \u003cem\u003eSupervisor\u003c\/em\u003e wide ranging powers to address matters of Defects, including requiring tests and inspections and issuing the Defects Certificate.\u003c\/p\u003e\n\u003cp\u003eYou can use this NEC3 ECC template for communications in respect of Defects as follows: - \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 40.3 of a test or inspection\u003c\/li\u003e\n\u003cli\u003eNotify under clause 40.3 of the result of a test or inspection\u003c\/li\u003e\n\u003cli\u003eNotify under clause 40.6 of the cost incurred by the \u003cem\u003eEmployer\u003c\/em\u003e in repeating a test or inspection\u003c\/li\u003e\n\u003cli\u003eNotify under clause 41.1 that Plant and Materials have passed a test or inspection\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 42.1 to search for a Defect\u003c\/li\u003e\n\u003cli\u003eNotify under clause 42.2 of a Defect\u003c\/li\u003e\n\u003cli\u003eNotify under clause 43.3 of the issue of the Defect Certificate\u003c\/li\u003e\n\u003cli\u003eSubmit\/notify under clause 44.1 a proposal to accept a Defect\u003c\/li\u003e\n\u003cli\u003eSubmit under clause 44.2 for acceptance a quotation to accept a Defect\u003c\/li\u003e\n\u003cli\u003eReply under clause 44.2 to a quotation to accept a Defect\u003c\/li\u003e\n\u003cli\u003eInstruct under clause 44.2 to change the Works Information after accepting a proposal not to correct a Defect\u003c\/li\u003e\n\u003cli\u003eNotify under clause 45.1 of the cost to the Employer of having a Defect corrected\u003c\/li\u003e\n\u003cli\u003eNotify under clause 45.2 of the cost the \u003cem\u003eContractor\u003c\/em\u003e would incur in correcting a Defect\u003cbr\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447052525629,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_0502e98c-4569-451a-99cf-80ef2484ca42.jpg?v=1563975443"},{"product_id":"nec3-ecc-payment-certificate","title":"NEC3 ECC Payment Certificate","description":"\u003cp\u003eUse this free downloadable template to help you create a payment application and certificate under the NEC3 Engineering and Construction Contract (ECC). \u003c\/p\u003e\n\u003cp\u003ePayment on construction projects is usually regulated by legislation. You must check which legislation applies in your jurisdiction to ensure these templates are suitable.\u003c\/p\u003e\n\u003cp\u003eYou can use these NEC3 ECC templates for the \u003cem\u003eContractor’s\u003c\/em\u003e application for payment and the \u003cem\u003eProject Manager\u003c\/em\u003e’s certificate as follows:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cem\u003eContractor’s\u003c\/em\u003e application for payment under clause 50.4\u003c\/li\u003e\n\u003cli\u003e\n\u003cem\u003eProject Manager\u003c\/em\u003e’s Payment Certificate under clause 51.1\u003c\/li\u003e\n\u003cli\u003eNotify under clause 51.2 of interest on a corrected payment certificate\u003c\/li\u003e\n\u003cli\u003eNotify under clause Y2.3 of an intention to pay less than the notified sum\u003c\/li\u003e\n\u003cli\u003eNotify under clause Y2.4 of an intention to suspend performance\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447065567293,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_1fdf66b4-a8fe-461e-847a-6829fec87f33.jpg?v=1563976507"},{"product_id":"nec3-ecc-compensation-event-notification-cen-by-the-project-manage-template","title":"NEC3 ECC Compensation Event Notification (CEN) by the Project Manager Template","description":"\u003cp\u003eUse this free downloadable template to help you create a compensation event notification under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eCompensation events are events listed in the contract which, if they occur and do not arise from the \u003cem\u003eContractor’s\u003c\/em\u003e fault, entitle the\u003cem\u003e Contractor\u003c\/em\u003e to be compensated for any effect the event may have on Prices, the Completion Date and any Key Dates. \u003c\/p\u003e\n\u003cp\u003eThe ECC contains strict notification and procedural requirements which take a compensation event from notification to implementation.\u003c\/p\u003e\n\u003cp\u003eYou can use these NEC3 ECC templates for notifying the following compensation events:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 60.1(1) of an instruction to change the Works Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(2) that the \u003cem\u003eEmployer\u003c\/em\u003e has not provided access to the Site\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(3) that the \u003cem\u003eEmployer \u003c\/em\u003ehas not provided something that he has to provide\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(4) of an instruction to stop or not start work or to change a Key Date\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(5) that the \u003cem\u003eEmployer\u003c\/em\u003e or Others do not work within the stated constraints\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(6) that the \u003cem\u003eProject Manager\u003c\/em\u003e or \u003cem\u003eSupervisor\u003c\/em\u003e does not reply to a communication\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(7) of an instruction dealing with an object of interest or value\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(8) that the \u003cem\u003eProject Manager\u003c\/em\u003e has changed a decision\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(9) that the \u003cem\u003eProject Manager\u003c\/em\u003e withholds an acceptance\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(10) of an instruction to search for a Defect and no Defect is found\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(11) that a test or inspection causes unnecessary delay\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(12) that the \u003cem\u003eContractor\u003c\/em\u003e encounters unexpected physical conditions\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(13) that an extreme weather measurement is recorded\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(14) of an event which is the \u003cem\u003eEmployer’s\u003c\/em\u003e risk\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(15) that the \u003cem\u003eProject Manager \u003c\/em\u003ecertifies take over before Completion\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(16) that the \u003cem\u003eEmployer\u003c\/em\u003e does not provide materials for testing\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(17) that the Project Manager notifies a correction to an assumption\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(18) of a breach by the \u003cem\u003eEmployer\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(19) of a prevention event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.4 of a difference between the final total quantity of an item and the quantity in the Bill of Quantities which delays completion (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.5 of a difference between the final total quantity of an item and the quantity in the Bill of Quantities (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.6 of the correction of a mistake in the Bill of Quantities caused by a departure from the method of measurement (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause X2.1 of a change in the law\u003c\/li\u003e\n\u003cli\u003eNotify under clause X12.3(7) of a change in the Partnering Timetable\u003c\/li\u003e\n\u003cli\u003eNotify under clause X12.3(8) of a change in the Partnering Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause X14.2 of a delay in making advanced payment\u003c\/li\u003e\n\u003cli\u003eNotify under clause X15.2 of correcting a Defect for which the \u003cem\u003eContractor\u003c\/em\u003e is not liable\u003c\/li\u003e\n\u003cli\u003eNotify under clause Y2.4 of suspension of performance\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eYou can also use these templates to:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eInstruct the \u003cem\u003eContractor\u003c\/em\u003e under clause 61.1 or 61.4 to submit a quotation for a compensation event\u003c\/li\u003e\n\u003cli\u003eInstruct the \u003cem\u003eContractor\u003c\/em\u003e under clause 61.2 to submit quotations for proposed instructions\u003c\/li\u003e\n\u003cli\u003eReply under clause 61.4 to the \u003cem\u003eContractor’s\u003c\/em\u003e notification of a compensation event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.4 and 62.5 of an agreement to extend the period for a submission or reply\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.4, 62.6 and 64.4 of a failure of the \u003cem\u003eProject Manager\u003c\/em\u003e to respond or make an assessment\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.5 that the \u003cem\u003eProject Manager\u003c\/em\u003e has decided that the \u003cem\u003eContractor\u003c\/em\u003e did not give early warning\u003c\/li\u003e\n\u003cli\u003eState assumptions under clause 61.6 about the event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.6 of a correction because an assumption on which a compensation event is based was wrong\u003c\/li\u003e\n\u003cli\u003eInstruct the \u003cem\u003eContractor\u003c\/em\u003e under clause 62.1 to submit alternative quotations for a compensation event\u003c\/li\u003e\n\u003cli\u003eSubmit a quotation for a compensation event under clause 62.3\u003c\/li\u003e\n\u003cli\u003eReply to a quotation under clause 62.3\u003c\/li\u003e\n\u003cli\u003eNotify under clause 64.3 of the \u003cem\u003eProject Manager’s\u003c\/em\u003e assessment of a compensation event\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447068254269,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_b3be1211-4356-4574-8b06-f6de2834b238.jpg?v=1563977184"},{"product_id":"nec3-ecc-compensation-event-notification-cen-by-the-contractor-template","title":"NEC3 ECC Compensation Event Notification (CEN) by the Contractor Template","description":"\u003cp\u003eUse this free downloadable template to help you create a compensation event notification under the NEC3 Engineering and Construction Contract (ECC). \u003c\/p\u003e\n\u003cp\u003eCompensation events are events listed in the contract which, if they occur and do not arise from the \u003cem\u003eContractor’s\u003c\/em\u003e fault, entitle the\u003cem\u003e Contractor\u003c\/em\u003e to be compensated for any effect the event may have on Prices, the Completion Date and any Key Dates.\u003c\/p\u003e\n\u003cp\u003eThe ECC contains strict notification and procedural requirements which take a compensation event from notification to implementation.\u003c\/p\u003e\n\u003cp\u003eYou can use these NEC3 ECC templates for notifying the following compensation events:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 60.1(1) of an instruction to change the Works Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(2) that the \u003cem\u003eEmployer\u003c\/em\u003e has not provided access to the Site\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(3) that the \u003cem\u003eEmployer \u003c\/em\u003ehas not provided something that he has to provide\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(4) of an instruction to stop or not start work or to change a Key Date\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(5) that the \u003cem\u003eEmployer\u003c\/em\u003e or Others do not work within the stated constraints\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(6) that the \u003cem\u003eProject Manager\u003c\/em\u003e or \u003cem\u003eSupervisor\u003c\/em\u003e does not reply to a communication\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(7) of an instruction dealing with an object of interest or value\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(8) that the \u003cem\u003eProject Manager\u003c\/em\u003e has changed a decision\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(9) that the \u003cem\u003eProject Manager\u003c\/em\u003e withholds an acceptance\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(10) of an instruction to search for a Defect and no Defect is found\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(11) that a test or inspection causes unnecessary delay\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(12) that the \u003cem\u003eContractor\u003c\/em\u003e encounters unexpected physical conditions\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(13) that an extreme weather measurement is recorded\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(14) of an event which is the \u003cem\u003eEmployer’s\u003c\/em\u003e risk\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(15) that the \u003cem\u003eProject Manager \u003c\/em\u003ecertifies take over before Completion\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(16) that the \u003cem\u003eEmployer\u003c\/em\u003e does not provide materials for testing\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(17) that the Project Manager notifies a correction to an assumption\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(18) of a breach by the \u003cem\u003eEmployer\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(19) of a prevention event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.4 of a difference between the final total quantity of an item and the quantity in the Bill of Quantities which delays completion (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.5 of a difference between the final total quantity of an item and the quantity in the Bill of Quantities (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.6 of the correction of a mistake in the Bill of Quantities caused by a departure from the method of measurement (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause X2.1 of a change in the law\u003c\/li\u003e\n\u003cli\u003eNotify under clause X12.3(7) of a change in the Partnering Timetable\u003c\/li\u003e\n\u003cli\u003eNotify under clause X12.3(8) of a change in the Partnering Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause X14.2 of a delay in making advanced payment\u003c\/li\u003e\n\u003cli\u003eNotify under clause X15.2 of correcting a Defect for which the \u003cem\u003eContractor\u003c\/em\u003e is not liable\u003c\/li\u003e\n\u003cli\u003eNotify under clause Y2.4 of suspension of performance\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eYou can also use these templates to:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eInstruct the \u003cem\u003eContractor\u003c\/em\u003e under clause 61.1 or 61.4 to submit a quotation for a compensation event\u003c\/li\u003e\n\u003cli\u003eInstruct the \u003cem\u003eContractor\u003c\/em\u003e under clause 61.2 to submit quotations for proposed instructions\u003c\/li\u003e\n\u003cli\u003eReply under clause 61.4 to the \u003cem\u003eContractor’s\u003c\/em\u003e notification of a compensation event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.4 and 62.5 of an agreement to extend the period for a submission or reply\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.4, 62.6 and 64.4 of a failure of the \u003cem\u003eProject Manager\u003c\/em\u003e to respond or make an assessment\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.5 that the \u003cem\u003eProject Manager\u003c\/em\u003e has decided that the \u003cem\u003eContractor\u003c\/em\u003e did not give early warning\u003c\/li\u003e\n\u003cli\u003eState assumptions under clause 61.6 about the event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.6 of a correction because an assumption on which a compensation event is based was wrong\u003c\/li\u003e\n\u003cli\u003eInstruct the \u003cem\u003eContractor\u003c\/em\u003e under clause 62.1 to submit alternative quotations for a compensation event\u003c\/li\u003e\n\u003cli\u003eSubmit a quotation for a compensation event under clause 62.3\u003c\/li\u003e\n\u003cli\u003eReply to a quotation under clause 62.3\u003c\/li\u003e\n\u003cli\u003eNotify under clause 64.3 of the \u003cem\u003eProject Manager’s\u003c\/em\u003e assessment of a compensation event\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003cp\u003e You can download this template for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447069368381,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_91b3971c-19c0-4352-802d-b82d6e8098c9.jpg?v=1563977481"},{"product_id":"nec3-ecc-project-managers-reply-to-a-cen-by-the-contractor-template","title":"NEC3 ECC Project Managers Reply to a CEN by the Contractor Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a Project Managers Reply to a CEN under the NEC3 Engineer and Construction Contract (ECC)\u003c\/p\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447071432765,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_570b8daa-9647-49bf-9cd1-3ede75633783.jpg?v=1563977651"},{"product_id":"nec3-ecc-project-managers-reply-to-a-quotation-for-a-compensation-event-template","title":"NEC3 ECC Project Managers Reply to a Quotation for a Compensation Event Template","description":"\u003cp\u003eUse this free downloadable template to help you create a compensation event notification under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eCompensation events are events listed in the contract which, if they occur and do not arise from the \u003cem\u003eContractor’s\u003c\/em\u003e fault, entitle the\u003cem\u003e Contractor\u003c\/em\u003e to be compensated for any effect the event may have on Prices, the Completion Date and any Key Dates.\u003c\/p\u003e\n\u003cp\u003eThe ECC contains strict notification and procedural requirements which take a compensation event from notification to implementation.\u003c\/p\u003e\n\u003cp\u003eYou can use these NEC3 ECC templates for notifying the following compensation events: \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 60.1(1) of an instruction to change the Works Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(2) that the \u003cem\u003eEmployer\u003c\/em\u003e has not provided access to the Site\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(3) that the \u003cem\u003eEmployer \u003c\/em\u003ehas not provided something that he has to provide\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(4) of an instruction to stop or not start work or to change a Key Date\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(5) that the \u003cem\u003eEmployer\u003c\/em\u003e or Others do not work within the stated constraints\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(6) that the \u003cem\u003eProject Manager\u003c\/em\u003e or \u003cem\u003eSupervisor\u003c\/em\u003e does not reply to a communication\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(7) of instruction dealing with an object of interest or value\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(8) of a change of a decision\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(9) of withholding an acceptance\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(10) an instruction to search for a Defect and no Defect is found\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(11) that a test or inspection causes unnecessary delay\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(12) that the \u003cem\u003eContractor\u003c\/em\u003e encounters unexpected physical conditions\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(13) that a weather measurement is recorded\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(14) an event occurs which is the \u003cem\u003eEmployer’s\u003c\/em\u003e risk\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(15) that the \u003cem\u003eProject Manager \u003c\/em\u003ecertifies Take Over before Completion\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(16) that the \u003cem\u003eEmployer\u003c\/em\u003e does not provide materials for testing\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(17) of the correction of an assumption\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(18) of the breach by the \u003cem\u003eEmployer\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(19) of a prevention event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.4 of a difference between the final total quantity of an item and the quantity in the Bill of Quantities which delays completion (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.5 of a difference between the final total quantity of an item and the quantity in the Bill of Quantities (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.6 of a correction of a mistake in the Bill of Quantities caused by a departure from the method of measurement (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause X2.1 of a change in the law\u003c\/li\u003e\n\u003cli\u003eNotify under clause X12.3(7) of a change in the Partnering Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause X15.2 of correcting a Defect for which the \u003cem\u003eContractor\u003c\/em\u003e is not liable\u003c\/li\u003e\n\u003cli\u003eNotify under clause Y2.4 of suspension of performance\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eYou can also use these templates to:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eInstruct the \u003cem\u003eContractor\u003c\/em\u003e under clause 61.1 to submit a quotation for a compensation event\u003c\/li\u003e\n\u003cli\u003eInstruct the \u003cem\u003eContractor\u003c\/em\u003e under clause 61.2 to submit quotations for proposed instructions\u003c\/li\u003e\n\u003cli\u003eReply under clause 61.4 to the \u003cem\u003eContractor’s\u003c\/em\u003e notification of a compensation event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 62.5 a request to extend the time to submit a compensation event quotation\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.4 and 62.5 of a decision to extend the time for a submission or reply\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.4, 62.6 and 64.4 of a failure of the \u003cem\u003eProject Manager\u003c\/em\u003e to respond or make an assessment\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.5 that the \u003cem\u003eContractor\u003c\/em\u003e did not give early warning\u003c\/li\u003e\n\u003cli\u003eState assumptions under clause 61.6 about the event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.6 that an assumption on which a compensation event is based was wrong\u003c\/li\u003e\n\u003cli\u003eInstruct the \u003cem\u003eContractor\u003c\/em\u003e under clause 62.1 to submit alternative quotations\u003c\/li\u003e\n\u003cli\u003eSubmit a quotation for a compensation event under clause 62\u003c\/li\u003e\n\u003cli\u003eReply to a quotation under clause 62.3\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eNotify under clause 64 of the \u003cem\u003eProject Manager’s\u003c\/em\u003e assessment of a compensation event\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eYou can download this template for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447072546877,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_1083f9fc-9fa3-4e42-a1df-459fa9d22814.jpg?v=1563977967"},{"product_id":"nec3-ecc-pms-instruction-to-submit-quotations-for-a-proposed-pmi-template","title":"NEC3 ECC PMS Instruction to Submit Quotations for a Proposed PMI Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a PMS Instruction to Submit Quotations for a Proposed PMI under the NEC3 Engineer and Construction Contract (ECC) \u003c\/p\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447073529917,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_3fcec680-09be-421c-8318-97b14ebb1870.jpg?v=1563978151"},{"product_id":"nec3-ecc-contractors-application-for-payment-option-c-e-only-template","title":"NEC3 ECC Payment Application and Certificate Template","description":"\u003cp\u003eUse this free downloadable template to help you create a payment application and certificate under the NEC3 Engineering and Construction Contract (ECC). \u003c\/p\u003e\n\u003cp\u003ePayment on construction projects is usually regulated by legislation. You must check which legislation applies in your jurisdiction to ensure these templates are suitable. \u003c\/p\u003e\n\u003cp\u003eYou can use these NEC3 ECC templates for the \u003cem\u003eContractor’s\u003c\/em\u003e application for payment and the \u003cem\u003eProject Manager\u003c\/em\u003e’s certificate as follows:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cem\u003eContractor’s\u003c\/em\u003e application for payment under clause 50.4\u003c\/li\u003e\n\u003cli\u003e\n\u003cem\u003eProject Manager\u003c\/em\u003e’s Payment Certificate under clause 51.1\u003c\/li\u003e\n\u003cli\u003eNotify under clause 51.2 of interest on a corrected payment certificate\u003c\/li\u003e\n\u003cli\u003eNotify under clause Y2.3 of an intention to pay less than the notified sum\u003c\/li\u003e\n\u003cli\u003eNotify under clause Y2.4 of an intention to suspend performance\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447091060797,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_ac1c5cc7-eb61-4b35-bfc5-705f4c68afc3.jpg?v=1563979737"},{"product_id":"nec3-ecc-quotations-for-compensation-event-template","title":"NEC3 ECC Quotations for Compensation Event Template","description":"\u003cp\u003eUse this free downloadable template to help you create a compensation event notification under the NEC3 Engineering and Construction Contract (ECC).\u003c\/p\u003e\n\u003cp\u003eCompensation events are events listed in the contract which, if they occur and do not arise from the \u003cem\u003eContractor’s\u003c\/em\u003e fault, entitle the\u003cem\u003e Contractor\u003c\/em\u003e to be compensated for any effect the event may have on Prices, the Completion Date and any Key Dates.\u003c\/p\u003e\n\u003cp\u003eThe ECC contains strict notification and procedural requirements which take a compensation event from notification to implementation.\u003c\/p\u003e\n\u003cp\u003eYou can use these NEC3 ECC templates for notifying the following compensation events:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNotify under clause 60.1(1) of an instruction to change the Works Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(2) that the \u003cem\u003eEmployer\u003c\/em\u003e has not provided access to the Site\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(3) that the \u003cem\u003eEmployer \u003c\/em\u003ehas not provided something that he has to provide\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(4) of an instruction to stop or not start work or to change a Key Date\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(5) that the \u003cem\u003eEmployer\u003c\/em\u003e or Others do not work within the stated constraints\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(6) that the \u003cem\u003eProject Manager\u003c\/em\u003e or \u003cem\u003eSupervisor\u003c\/em\u003e does not reply to a communication\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(7) of instruction dealing with an object of interest or value\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(8) of a change of a decision\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(9) of withholding an acceptance\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(10) an instruction to search for a Defect and no Defect is found\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(11) that a test or inspection causes unnecessary delay\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(12) that the \u003cem\u003eContractor\u003c\/em\u003e encounters unexpected physical conditions\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(13) that a weather measurement is recorded\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(14) an event occurs which is the \u003cem\u003eEmployer’s\u003c\/em\u003e risk\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(15) that the \u003cem\u003eProject Manager \u003c\/em\u003ecertifies Take Over before Completion\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(16) that the \u003cem\u003eEmployer\u003c\/em\u003e does not provide materials for testing\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(17) of the correction of an assumption\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(18) of the breach by the \u003cem\u003eEmployer\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.1(19) of a prevention event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.4 of a difference between the final total quantity of an item and the quantity in the Bill of Quantities which delays completion (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.5 of a difference between the final total quantity of an item and the quantity in the Bill of Quantities (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause 60.6 of a correction of a mistake in the Bill of Quantities caused by a departure from the method of measurement (main Options B and D)\u003c\/li\u003e\n\u003cli\u003eNotify under clause X2.1 of a change in the law\u003c\/li\u003e\n\u003cli\u003eNotify under clause X12.3(7) of a change in the Partnering Information\u003c\/li\u003e\n\u003cli\u003eNotify under clause X15.2 of correcting a Defect for which the \u003cem\u003eContractor\u003c\/em\u003e is not liable\u003c\/li\u003e\n\u003cli\u003eNotify under clause Y2.4 of suspension of performance\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eYou can also use these templates to:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eInstruct the \u003cem\u003eContractor\u003c\/em\u003e under clause 61.1 to submit a quotation for a compensation event\u003c\/li\u003e\n\u003cli\u003eInstruct the \u003cem\u003eContractor\u003c\/em\u003e under clause 61.2 to submit quotations for proposed instructions\u003c\/li\u003e\n\u003cli\u003eReply under clause 61.4 to the \u003cem\u003eContractor’s\u003c\/em\u003e notification of a compensation event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 62.5 a request to extend the time to submit a compensation event quotation\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.4 and 62.5 of a decision to extend the time for a submission or reply\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.4, 62.6 and 64.4 of a failure of the \u003cem\u003eProject Manager\u003c\/em\u003e to respond or make an assessment\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.5 that the \u003cem\u003eContractor\u003c\/em\u003e did not give early warning\u003c\/li\u003e\n\u003cli\u003eState assumptions under clause 61.6 about the event\u003c\/li\u003e\n\u003cli\u003eNotify under clause 61.6 that an assumption on which a compensation event is based was wrong\u003c\/li\u003e\n\u003cli\u003eInstruct the \u003cem\u003eContractor\u003c\/em\u003e under clause 62.1 to submit alternative quotations\u003c\/li\u003e\n\u003cli\u003eSubmit a quotation for a compensation event under clause 62\u003c\/li\u003e\n\u003cli\u003eReply to a quotation under clause 62.3\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eNotify under clause 64 of the \u003cem\u003eProject Manager’s\u003c\/em\u003e assessment of a compensation event\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eYou can download this template for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447101579325,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_032eaf35-153b-4141-9aee-cff8898b0428.jpg?v=1563980402"},{"product_id":"nec3-ecc-breakdown-of-defined-costs-template","title":"NEC3 ECC Breakdown of Defined Costs Template","description":"\u003cp\u003eUse this free downloadable template to help you put together a Breakdown of Defined Costs under the NEC3 Engineer and Construction Contract (ECC)\u003c\/p\u003e\n\u003cp\u003eYou can download this template as a PDF for free!\u003c\/p\u003e","brand":"Built Intelligence","offers":[{"title":"Default Title","offer_id":29447120879677,"sku":"","price":0.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/products\/shutterstock_448235266_94e43f90-48aa-4cb8-b6d9-64b4fc6d6431.jpg?v=1563980885"}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0248\/4926\/collections\/shutterstock_406160_514fe694-2d5e-4814-ad7b-ee4445045399.jpg?v=1563550777","url":"https:\/\/store.builtintelligence.com\/collections\/aecom-academy.oembed?page=31","provider":"Built Intelligence","version":"1.0","type":"link"}