An Overview of the Role of the Contractor Under the FIDIC Red Book (Part 1)

An Overview of the Role of the Contractor Under the FIDIC Red Book (Part 1)

Level Advanced
Duration 30 minutes

The Contractor’s basic obligations and responsibilities are set out in Clause 4.  As may be imagined, this clause is significantly longer than either Clause 2 (Employer) or 3 (Engineer), as the Contractor is actually undertaking the Works and will be responsible for security, health and safety and many other matters.  

Clause 4 has 23 separate Sub-Clauses, which cover matters from the general responsibilities of the Contractor, through Archaeological finds and progress reporting.  It should be the starting point for anyone trying to understand how the Contractor should be acting on Site.

Given the length of this Clause, it has been split into two courses. This first course will look at the elements relevant to undertaking the Works, including the obligation to undertake the Works properly, design submission, rights of access and utilities.

Accreditations & CPD

This course provides structured Continuing Professional Development (CPD). Recognition of CPD is subject to individual professional body requirements and the learner’s role. This course is not formally accredited unless explicitly stated.

Suitable for CPD requirements of RICS, CIOB, ICE, APM, and PMI members.

Learning Outcomes

At the end of this course, you should understand:

• The general responsibilities of the Contractor
• How the Contractor’s design is produced, submitted and reviewed
• Who is responsible for setting out the Works, with or without information from the Employer
• The Quality Management and Compliance Verification Systems

About the Author

This course is produced by Built Intelligence, in association with Michael Bennett.

Michael is a solicitor and adjudicator with over 15 years of experience. He specialises in engineering and construction disputes, with a particular focus on highly technical matters and has advised on projects across almost every sector, including power, rail, road, pharmaceutical, oil and coastal defence.