Skip to product information
1 of 1

Design Submissions and IP Rights under JCT SBC 2024

Design Submissions and IP Rights under JCT SBC 2024

Level Advanced
Duration 30 minutes

In the last module we examined the Contractor’s design obligations and the Contractor’s Designed Portion.  In this module we will move on to look at the design as it is advanced during the construction phase.

In addition we will also look at intellectual property rights and how these are dealt with under the JCT 2024.  This is an issue that is most likely to arise in relation to the design.

Accreditations & CPD

This course provides structured Continuing Professional Development (CPD). Recognition of CPD is subject to individual professional body requirements and the learner’s role. This course is not formally accredited unless explicitly stated.

Suitable for CPD requirements of RICS, CIOB, ICE, and CICES members.

Learning Outcomes

After completing this module, you should:

• Understand the Design Submission Procedure
• Know when documents should be submitted
• Be able to explain how and what documents to submit
• Know how patent fees and royalties are dealt with

About the Author

This course is produced by Built Intelligence, in association with Michael Bennett.

Michael is a solicitor and adjudicator with over 15 years of experience. He specialises in engineering and construction disputes, with a particular focus on highly technical matters and has advised on projects across almost every sector, including power, rail, road, pharmaceutical, oil and coastal defence.

View full details