NEC3 ECS Subcontractor's Issue for Acceptance (SIA) Template

NEC3 ECS Subcontractor's Issue for Acceptance (SIA) Template

Use this free downloadable template to help you put together a Subcontractor issue for acceptance under the NEC3 Engineer and Construction Subcontract (ECS).

You can use this NEC3 ECS template for a Subcontractor Issue of Acceptance to do the following: -

  • Issue for acceptance under clause 21.2 design in accordance with Works Information,
  • Issue for acceptance under clause 23.1 design of an item of Equipment in accordance with Works Information,
  • Issue for acceptance under clause 24.1 changes in key person who are equally qualified and experienced as the person originally named in the Contract Data,
  • Issue for acceptance under clause 26.2 Sub-subcontractors,
  • Issue for acceptance under clause 26.3 Sub-subcontract conditions,
  • Issue for acceptance under clause 31.1 first programme for acceptance,
  • Issue for acceptance under clause 32.1 revised programme for acceptance,
  • Issue for acceptance under clause 36.2 a quotation for acceleration,
  • Issue for acceptance under clause 85.1 Subcontractor insurances,
  • Issue for acceptance under clause 54.2 a revised activity schedule,
  • Issue for acceptance under clause 26.4 proposed sub-subcontract data, and
  • Issue for acceptance under clause X13.1 a performance bond.

You can download this template as a PDF for free!