Skip to product information
1 of 1

Practical Ways the Water Sector Can Improve Resilience while Cutting Carbon

Practical Ways the Water Sector Can Improve Resilience while Cutting Carbon

Level Beginner
Duration 5 minutes

The water sector faces a paradox: cutting capital and operational carbon while at the same time maintaining performance standards in the face of a changing climate. In this course, we examine practical ways that the water sector can address the challenge.

Learning Outcomes

By the end of this course, you should be able to:

• Understand the importance of assessing the carbon impact of infrastructure projects and considering the need for infrastructure early in the planning process
• Identify the scale of potential carbon impact and determine if infrastructure projects are essential or if the scope can be reduced

View full details