1
/
of
1
Waitrose: Building Retail With BIM
Waitrose: Building Retail With BIM
Level
Beginner
Duration
5 minutes
Couldn't load pickup availability
How can building information modelling (BIM) help to create a highly effective retail space? Join Andy Smith, General Manager of Future Planning at leading UK retailer Waitrose, for this short presentation on how BIM is streamlining the delivery process, reducing costs and lifting the food trade to a higher plane.
View full details
